Bathroom Installation
Recently complete project.
Before
Design & Planning
This particular bathroom was a big project. The bathroom door was situated on the far left, with the airing cupboard door situated to the right of this. Our clients asked us to move the airing cupboard into the left corner and situate the bathroom door more centrally.
During
Stress-free & Quality Service
We prefer to strip bathrooms out completely, often taking the floor up in order to move/add pipework, although this can sometimes be done from the roof space. If required, we fix timber and boarding to the walls to level them up, hide pipework, and allow space for a built in cistern or shower valve.
After
Quality Assured Results
Depending on the level of work involved, our projects take anywhere from two to six weeks. We prefer to have a clean finish - with no boxings or visible pipework - and the key to this is in the preparation.
Get your project started.
We are always ready to help you transform your bathroom. Please check out our services or give us a call for a chat about your bathroom.